Town of Moraga
Located just south of the Town of Moraga, the Canyon Road Bridge Replacement Project replaces a single-lane temporary bridge that spans over the Moraga Creek with a new, 2-lane single-span cast-in-place structure that includes a pedestrian walkway. The project also incorporates 2 new precast concrete retaining walls and 2 bio-retention basins, which allows for better drainage and a wider, safer roadway and bridge. The project started 4/20/2020 and is projected to be completed by the end of 2021.