SR 1 Bodega Bay Bridge Construction
The project consists of the installation of twelve 84” cast in drilled hole concrete piles, construction of 12 cast in place concrete piers, installation of twelve 24” cast in drilled hole concrete piles, placement of nearly 4,000 cubic yards of concrete, installation of transverse and longitudinal prestressing, installation of bridge and deck drainage systems, installation of 950 lineal feet of architectural picket railing, installation of 1,800 lineal feet of tubular handrailing, construction of 1,820 lineal feet of cast in place concrete barrier rail, and nearly 90,000 square feet of bridge staining. This project is located on Highway 1 that runs through Bodega Bay, CA in a highly sensitive environmental area. The construction will take place over two seasons with work in the first season consisting of the installation of the 84” CIDH and construction of the cast in place concrete piers. The construction during the second season will consist of installation of twelve 24” CIDH, installation of falsework, construction of the new bridge, installation of the architectural picket railing, and construction of the cast in place concrete barrier rail.