Corralitos Bridge Widening
Situated in the historic town of Watsonville, this projects scope of work included a retrofit of the existing Westbound Lane on CA-152, adding ADA ramps, reconfiguring pedestrian crossing, Asphalt Cold Plaining, Polyester Concrete for the Bridge Deck, Barrier Slabs and Barrier Rail with Bicycle Railing. The project was completed in August of 2023.