Berryessa Knoxville Rd. Culvert Replacement Project – Napa, CA
This Project replaced an existing culvert with a new 25’ long reinforced concrete slab bridge that was damaged during a storm event in 2017. The new bridge has (2) 12’ travel lanes and steel bridge railings attached to the deck. The project required a water diversion and roadway detour.