Stockton Gore and Slope Paving, Caltrans Contract #10-0X6404
This project consisted of 14 gore paving locations, 12 slope paving locations, and 6 maintenance vehicle pullouts along Highway 99 from Stockton to Lodi. The gore paving areas were treated with a brick stamp pattern and a red color hardener to provide a greater aesthetic appeal. We partnered with Caltrans to change the staging on the MVP’s to provide a more efficient process and reduce the impact to the travelling public. The slope paving operation was the most challenging aspect of the project. Access was limited due to the proximity of the freeway and the steep slopes made any use of equipment nearly impossible. Our team members worked together to create a plan to perform the work safely and executed each aspect to near perfection.